Aviation.ca - Your Number One Source for Canadian Aviation News, Jobs and Information!

First A350 XWB with wings complete emerges for outdoor testing

Rate this item
(0 votes)
First A350 XWB with wings complete emerges for outdoor testing Airbus

The first A350 XWB – MSN001 – now showing its completed wings, has moved to its next phase of ground testing, from Roger Béteille A350 XWB FAL “Station 30” to the Clément Ader area “Station 18” in Toulouse. The aircraft is structurally complete and shows the installed winglets, belly fairing panels, main landing gear doors.

The aircraft has recently completed successfully a series of indoor ground tests as well as stability tests on ‘movable’ elements such as rudder, elevators, ailerons and wing spoilers and landing gears extraction/retraction. The next steps which will take place outdoors at the Station 18 ground test station will include three planned families of tests: Fuel tanks testing – including levels, flows, sealing and internal fuel transfer functions; pressure testing of the fuselage; and radio equipment testing.

Login to post comments
         
Aviation.ca is not responsible for the content of external Internet sites. Copyright © 1997-2015 Skytech Dynamics Corporation, All rights reserved exogenous-blank
exogenous-blank
exogenous-blank
exogenous-blank

Login or Register